Passa ai contenuti principali

WORK TIME RECORDING AND JOB MANAGEMENT

From paper job sheets to digital time recording

How much time was spent on a customer order? And how much was needed for each operation required to complete it?

A workshop may use a paper job sheet to collect this information. The person doing the work records the order, the activity performed and the time spent. In this article, a job means the work required to fulfil a specific customer order.

For example, completing a job may involve cutting some parts and then assembling them. The sheet collects the time spent on these two operations.

Moving to digital recording means entering this information using an IT tool instead of a paper sheet. But choosing the tool is only part of the work. You also need to decide who enters the data, when they do it, who checks for missing information and how the recorded times will be viewed.

We will explore these choices through one illustrative workshop example. The aim is to understand what to check before replacing the sheet in day-to-day time recording, not to dispose of existing archives or other documents that need to be retained.

1. Understand how the sheet is used today

Start by looking at what happens between someone writing on the sheet and someone else using that information. We suggest tracing this process before deciding how to move it to a digital system.

An example: a job involving cutting and assembly

Imagine that a customer orders some parts that need to be cut and assembled. The workshop assigns the order a reference so that it can be identified: the job reference.

In our example, time recording works as follows:

  1. The person doing the cutting writes the job reference, the operation “cutting” and the time spent on the sheet.
  2. The person doing the assembly records their work and the time spent.
  3. The workshop supervisor collects the sheets and checks that the entries are understandable. If something is missing, they ask the person concerned for clarification.
  4. Someone in the office transfers the data to a summary, which the production manager uses to see the times recorded for the two operations.

This is an illustrative example: it does not describe a customer case or a procedure that every business should adopt.

Keep useful information and review the steps

In this situation, the sheet does more than record time. It also communicates that time to the workshop supervisor and passes it on to whoever prepares and reads the summary.

To replace it, we therefore suggest defining five elements: who records the data, when, who checks it, who resolves queries and who uses it.

Tracing the process also helps you assess subsequent re-entry of data. If someone copies the information into another document, establish what they add and who needs the result. Only then can you check whether the new system can simplify that step.

Being able to enter information is not enough: you also need to plan how it will be checked and made available.

2. Decide what information to record

Once you understand how the sheet is used, you can examine its contents. We suggest keeping the information needed by those who collect, check and consult the time data, rather than automatically transferring every field on the paper sheet to a screen.

Link time to the work performed

For our illustrative workshop, start with a record that identifies:

  • The job.
  • The operation performed: cutting or assembly.
  • The person who did the work.
  • The relevant date.
  • The time spent.

This is not a mandatory template for every business. Each additional item should have a clear purpose and someone who uses it.

The way work is identified also needs to be shared. If a job is identified by a code, the person recording the time needs to know which one to use. The same applies to operation names: “cutting” and “assembly” need to mean something clear to everyone involved.

Give the recorded time a shared meaning

In our example, we suggest recording the time each person spends on the operation. We are not asking how long the whole job took from start to finish.

This distinction matters when several people work together. If two people each spend one hour on assembly, the operation lasts one hour, but their combined working time is two hours.

You then need to choose how to collect that time: enter a duration or record start and finish times. Assess this choice against the work being done and the methods supported by the tool, without assuming that calculations happen automatically.

The aim is a clear recording rule: the person entering the data and the person reading it should understand it in the same way.

3. Define where, when and by whom time is recorded

Recording needs to fit into the working day. To define how it will work, we suggest starting with the conditions in the workshop, not with the device you would like to buy.

Choose a recording point suited to the work

In our example, cutting and assembly might take place in different areas. Assess where people will be able to record their time and whether the proposed method will still require notes to be transcribed later.

A shared workstation, a computer or a mobile device are options to assess, not interchangeable solutions or features you can take for granted. The choice will depend on workshop conditions and the devices the system actually supports.

Define when entries are made

If time is to be recorded at the start and end of an operation, clarify what to do when someone changes activity or interrupts their work.

If a duration is entered after the operation is finished, establish how that duration will be determined and which job it will be assigned to.

In our illustrative workshop, the rule must distinguish time spent cutting from time spent assembling. We do not assume that the system automatically detects a change of activity.

Assign responsibility for data entry

The person doing the work and the person recording the time may be the same person or different people.

If a supervisor is responsible for entering the data, define how they will receive the information from the person who performed the operation. Otherwise, digital recording could continue to depend on paper notes or messages that have to be entered into the system later.

For each operation, we therefore suggest setting out a simple rule:

Time is recorded by the designated person, at the agreed point and using the selected tool.

The methods do not necessarily have to be identical for cutting and assembly, but they need to be defined and understood by the people involved.

4. Handle missing information without falling back on paper

Replacing the paper sheet also means planning how to handle an incomplete or incorrect entry.

We suggest assigning a point of contact for clarification and agreeing on a way to correct information, rather than leaving each person to decide what to do whenever an issue arises.

Assign a point of contact for clarification

In our illustrative workshop, the workshop supervisor is the point of contact for checking entries. They check that the agreed information is present: person, date, job, operation and time spent.

If an entry does not identify the operation, they do not assign the time to cutting or assembly by guesswork. They ask the person who did the work for clarification.

This way, the person recording the data knows whom to contact, and the person checking it knows how to obtain missing information.

Distinguish clarified information from entries still needing checks

We suggest keeping entries that need clarification identifiable, rather than treating them as final in summaries used for operational purposes.

How this is done depends on the chosen tool: we do not assume that automatic alerts, verification statuses or blocking functions are available. The organisational principle remains clear: anyone consulting the times needs to know whether information is still incomplete.

Entered data is not necessarily checked data. Moreover, checking that an entry is complete does not, on its own, prove that every detail accurately describes the work performed.

Define who can correct entries

Before introducing digital recording, we suggest identifying who can complete or edit the data and how they should receive the clarification they need.

In our illustrative workshop, the supervisor clarifies the query with the person who did the work. The designated person then updates the entry based on the information received, without reconstructing it by guesswork.

Any approval by a manager remains a separate step: correcting an entry does not mean approving it. Editing capabilities and the relevant permissions need to be checked in the selected solution.

5. Make time data available to the people who need it

Once time data has been recorded and checked, it needs to be accessible for the purpose that prompted its collection.

In our example, the production manager needs to know the time spent cutting and assembling for a particular job.

We suggest starting with that use to define the summary required, then checking how it can be produced with the chosen solution. Not everyone needs to see every detail: relevant data needs to be made available to authorised people.

Organise the summary around the job

For our illustrative workshop, we suggest a summary that identifies:

  • The job to which the times relate.
  • The operations performed, distinguishing cutting from assembly.
  • The relevant period.
  • The combined hours spent by people on each operation.
  • Any information still requiring clarification.

Readers need to know what the figures represent. Hours spent by people must not be confused with the elapsed time from the start to the end of the operation.

This is the proposed content for our example, not a description of an existing report. On-screen views, filters, printouts and exports will need to be checked in the chosen solution.

Keep attendance time distinct

Attendance hours show how long a person is recorded as present under the attendance system in use. Job time, by contrast, is time assigned to specific work.

We keep these meanings separate in the proposed summary. We do not assume that all attendance hours must be assigned to jobs, and we do not automatically interpret a difference as an error or inefficiency.

If the two sets of data need to be compared, define the purpose of the comparison and check whether a link between the systems is actually available.

From recording to use: three distinct stages

The process proposed for the workshop can be summarised as follows:

  1. Recording — The designated person enters the time and links it to the job and operation.
  2. Checking — The assigned point of contact checks the agreed information and obtains clarification for anything missing or unclear.
  3. Use — The production manager consults the summary, distinguishing clarified information from entries still needing checks.

These three stages describe a way of organising work, not an automatic workflow guaranteed by software. The tool should also be assessed for the support it can provide at each stage.

6. Check the transition before extending it

To introduce digital recording, we suggest starting with a limited scope: an operation, a group of jobs or a department, selected according to the way the workshop is organised.

The aim is to check the complete information process, from the person recording the time to the manager consulting it.

Test the process in everyday work

In our example, the check follows cutting and assembly times for selected jobs. The people involved use the agreed methods to record their work; the workshop supervisor checks the information and obtains clarification where it is incomplete; the production manager consults the summary.

During this check, we suggest noting practical obstacles: a job that is difficult to identify, an unsuitable moment for recording, unclear responsibility or necessary information missing from the summary.

These findings help you review organisational choices and, where needed, tool configuration. They are not automatically mistakes made by staff.

Before extending the transition, check that the difficulties identified have been addressed. The initial scope and any period of running alongside existing methods should be defined for the business context, rather than imposing the same duration on everyone.

Before replacing the paper job sheet: what to check

  • The scope of the transition is defined

    Is it clear which operations or jobs will move to digital recording and which uses of the sheet are to be replaced?

  • The information to be recorded is understandable

    Does the person making the entry know how to identify the job and operation, and which time to record?

  • The recording time and location are defined

    Has it been established who enters the data, where, and whether during the activity or afterwards?

  • It is clear who checks the information

    Has someone been assigned to check entries, and is there a point of contact for queries or missing data?

  • The handling of corrections is defined

    Is it clear who can make changes and how, without confusing a correction with any approval?

  • The data is available to those who need it

    Have authorised recipients, their information needs and the access methods to be checked been identified?

  • The transition has been checked within a limited scope

    Before extending it, has it been checked that people can record, clarify and consult the necessary information?

This check concerns replacing the sheet in the operational process: it does not authorise the disposal of existing documents or archives.

Replace the sheet while keeping the work clear

In our illustrative workshop, the move to digital recording is not complete when cutting and assembly times have been entered into the system. The process is complete when people know how to record them, queries are resolved and the production manager can consult the information they need.

This is the approach to replacing paper job sheets: define how time recording should work and check that the chosen solution supports that way of working.

For information about Osti solutions for work time recording and job management:

Post popolari in questo blog

Software gestione presenze web Venezia Juniorweb gestisce tutto il processo di richiesta ferie e permessi del dipendente con richiesta ed approvazione

Il software di rilevazione delle presenze web Juniorweb   è una valida soluzione per la gestione delle presenze dei dipendenti. Con il modulo workflow , il dipendente può accedere al programma inserendo il proprio nome utente e la propria password e richiedere un giustificativo al responsabile del personale, come ferie oppure permessi; riceverà poi la notifica sulla propria mail. Scopri tutte le altre caratteristiche su  : Software gestione presenze web Venezia Juniorweb gestisce tutto il processo di richiesta ferie e permessi del dipendente con richiesta ed approvazione   (Basho) -- Questo messaggio è stato analizzato con Libra ESVA ed è risultato non infetto. This message has been checked by Libra ESVA and is believed to be clean.

Timbracartellino Max1500: impostazione data ora

Qual'è la più importante caratteristica tecnica de timbracartellino Max1500, che lo differenzia dai marcatempo di bassa qualità (c.d. "cinesi")? Innanzitutto la certezza che data e ora non possono essere modificati (sul mercato ci sono molti timbracartellino di bassa qualità che non hanno chiavi di protezione). Infatti tutta la linea Max utilizza una Keycard di protezione senza la quale non è possible accedere al set-up del marcatempo. Guarda il ns. video per sapere come cambiare data / ora. La forza del timbracartellino è la semplicità! Timbracartellino Max1500 modifica data ora  (Kubera)

Software gestione presenze web Milano il dipendente timbra con lo smartphone con rilevamento posizione di Google Maps

Il software della rilevazione delle presenze web Juniorweb  rappresenta una valida soluzione per la gestione delle presenze nelle piccole e medie aziende. Il dipendente può timbrare con lo smartphone ed è possibile rilevare l’esatta posizione con Google maps. Scopri tutte le altre caratteristiche su  : Software gestione presenze web Milano il dipendente timbra con lo smartphone con rilevamento posizione di Google Maps   (Basho)